Delta Toronto Hotel – Boiler Plant Retrofit
Location: 75 Lower Simcoe Street, Toronto, ON
Complete retrofit and modernization of the central boiler plant, including the replacement and upgrade of mechanical equipment, piping modifications, system integration, testing, and commissioning to improve operational efficiency and long-term reliability.
8 Le Monde – Domestic Water Piping Retrofit
Location: Toronto, ON
Complete retrofit and replacement of the building’s domestic water piping system, including installation of new piping, valves, supports, insulation, testing, and commissioning while minimizing disruption to occupied spaces.
3575 Kaneff Crescent – Chiller Plant Retrofit
Location: Mississauga, ON
Mechanical retrofit and modernization of the building’s chilled water plant, including chiller replacement, piping modifications, equipment connections, system balancing, startup, and commissioning.
Some Canada Projects
- Sunyside home (plumbing &hvac)
- Parkdale elementary school ( plumbing & hvac)
- Durham college ( plumbing & hvac)
- Avis Car (Plumbing)
- Victoria College (Plumbing)
- 229 Airdrie (Residential Plumbing)
- Hotel Europa (Boilers & Mechanical Room)
- 40 Units In Longue Montreal (Plumbing & Mechanical Room)
Some Middle East Project
- Plumbing & HVAC Of Central Bank Of Iran (EPC Project)
- Plumbing & Mechanical Room Of Hotel Tehran (EPC Project)
- Plumbing & HVAC Of Saipa Manufactory (EPC Project)
- Plumbing & HVAC & Waste Water Piping Of Phase 19 South Pars (EPC Project)
